Global Outerwear, Sportswear and Protective Equipment Specialist, VT Garment Improves Productivity by 95%, Plan Accuracy by 92% and Increases its OTDP by 50% with Coats Digital’s FastReactPlan
The adoption of FastReactPlan helped VT Garment secure the prestigious ‘Golden Award’ at the Thailand Lean Award 2017 in recognition of its outstanding LEAN manufacturing and management processes.
Coats Digital is delighted to announce that following the implementation of Coats Digital’s FastReactPlan solution, award-winning, global manufacturer of outerwear, sportswear and specialised protective equipment, VT Garment Co. Ltd., has realized an unprecedented 95% productivity improvement; increased its capacity plan accuracy by 92%; and doubled its On Time Delivery performance since its adoption of FastReactPlan.
The solution has also optimised overall planning time by 57%; reduced time spent loading orders by 67% and significantly reduced people hours spent recording plan variations from 4 hours to just 10 minutes. Since implementation, the company has additionally eliminated unnecessary overtime staff hours altogether and boosted staff morale by simplifying the often challenging and stressful task of planning which had negatively impacted the whole business.
The adoption of FastReactPlan was instrumental in helping VT Garment secure the coveted ‘Golden Award’ at the ‘Thailand Lean Award 2017,’ – an influential government-subsidized nationwide awards ceremony covering all manufacturing industries. The annual Thailand Lean Award recognizes companies that have undertaken strategic changes to their businesses to adhere to lean management principles. Award winners serve as exemplary leaders to others who are looking at adopting lean management for quality, savings, delivery and speed.
Founded in 1981, VT Garment is an award-winning global manufacturer of outerwear, sportswear and protective equipment, such as: ski jackets and pants, boardshorts, polyester padded jackets, woven jackets and pants, knitted jackets and bulletproof armor-plated materials. Around 20 per cent of VT Garment’s electricity usage comes from solar energy and it has ISO 9001 certified facilities in Thailand and Myanmar which produce over 136,000 pieces per month.
The company boasts an annual turnover of 50 million USD and its customers include: Patagonia, Jack Wolfskin, Montbell, O’Neill and other big and small brands in the United States and Europe. VT Garment supports a workforce of 2,000 and has one of the largest Original Equipment/Original Design Manufacturing (OEM/ODM) factories in the world with Fair Trade certification. The company’s dedication to innovation, local sustainability, environmental protection, fair wages, and advanced digitization has secured it a raft of other awards including the Thailand Quality Award (Golden) and the Thailand Kaizen Award (Golden).
Chalumpon Lotharukpong, Managing Director, VT Garment, said: “Hyperinflation leads to softening market conditions leaving large amounts of excess stock for brands and retailers. This, in turn, adversely impacts order volumes for manufacturers. Against this backdrop, apparel manufacturers need to rethink and overhaul their operations. To combat the current ‘fluid’ fashion environment, it is inevitable that we needed to be more lean, digital and agile. We, consequently, chose Coats Digital as our transformation partner because of their experience in delivering innovative solutions that support our journey towards operational excellence. One of the defining reasons for our selection of Coats Digital was to support our entry at the ‘Thailand Lean Awards 2017’. We were subsequently delighted to win the prestigious ‘Golden Award’ for recognition of our adoption of FastReactPlan. The award is a testament to the effectiveness of how the FastReactPlan system has been instrumental in supporting our Lean Manufacturing objectives to help us achieve significant improvements in our production processes.”
Prior to implementing FastReactPlan, VT Garment found that the lack of automation and real-time visibility in the production planning process not only meant there was limited information sharing between different departments, but also that manually produced capacity plans based on unreliable historical data, were time-consuming and cumbersome to produce and not accurate enough to make informed production decisions from. As a result, VT Garment’s management and planning teams found that capacity was often over-booked or under-booked, causing late deliveries and unnecessary staff overtime costs.
Insufficient tools and resources for monitoring and optimising production efficiency, lengthy reporting times and limited information sharing and coordination between departments also meant that VT Garment was unable to respond to customer demands for quicker order confirmations, resulting in lost business and poor customer satisfaction levels. This led to increased pressure on staff, wasted resources and decreased profitability. An inability to make informed business decisions consequently not only negatively impacted overall company performance, but also its potential for growth.
Following the implementation of FastReactPlan, VT Garment now has the ability to view capacity plans from multiple perspectives, resulting in a comprehensive understanding of its production capabilities and limitations. The solution has enabled VT Garment to easily compare different plans and select the most optimal option based on factors such as cost, efficiency and delivery time.
The automation of planning processes has also freed up time for staff to focus on other important tasks, such as improving customer satisfaction and supporting new innovations and business growth.
Chalumpon Lotharukpong, Managing Director, VT Garment, said: “Manually creating each plan would take an average of one hour per plan. So, with four typical plans it would take four hours to complete. With FastReactPlan, we are now able to quickly evaluate the efficiency of each plan variation, which has reduced the time spent on planning from four hours to 10 minutes. This has helped us reduce planning time by 57%, reduce order plan loading by 67% and improved our overall productivity efficiency by 95% across the whole business.”
A significant reduction in errors and a more accurate representation of its production capabilities has also led to a 92% improvement in plan accuracy which has improved VT Garment’s ability to meet customer delivery expectations. The ability to quickly review and revise plans immediately by monitoring late order requests and on-time items has also increased its OTDP performance by 50%.
Chalumpon Lotharukpong, Managing Director, VT Garment adds: “We are exceptionally pleased with FastReactPlan. It allows us to plan better because we can choose the plan based on different factors, such as Capacity, Efficiency and OTD percentages, which has eliminated the need for manual calculations altogether. The customer experience has also greatly improved as a result of our ability to provide timely and accurate information, which is crucial for customers to make informed commissioning decisions. With the implementation of FastReactPlan, we are now able to send accurate plans and information to customers in less than two hours, rather than the usual 3 days it took before the implementation.”
The solution has enabled VT Garment to save significant staff hours by streamlining the planning process, from order placement and checking delivery dates to tracking production activities, which has meant that extra time can be dedicated to delivering an enhanced customer experience.
Chalumpon Lotharukpong, Managing Director, VT Garment, explains: “FastReactPlan has effectively eliminated the need for overtime work. Prior to its implementation, our planner typically had to work four to six additional hours of overtime to meet delivery deadlines. Since implementation, our planner now has much more time for other tasks that can greatly enhance the business. Because all are plans are now based on accurate data, we are also benefiting from a significant reduction in overtime hours on the factory floor, as well as greatly reduced levels of firefighting, since we can now anticipate potential issues with future orders – such as delayed raw materials or late orders – and address them proactively.”
VT Garment found that the FastReactPlan implementation had a positive impact on staff morale by simplifying the challenging task of planning and reducing unnecessary and unplanned overtime hours, so that staff had a more consistent, stress-free working environment.
With the ability to anticipate future plans and understand available capacity, VT Garment can now accurately calculate working hours effectively to take on additional business orders that it would have previously shied away from. FastReactPlan has also enabled the company to handle a wider range of orders, including shorter and more complex order requests, as it has the visibility and agility needed to make informed decisions based on accurate plan variation assessments.
Chalumpon Lotharukpong, Managing Director, VT Garment, concludes: “With its many functions, FastReactPlan has enabled us to cope with all situations, whether large or small orders. In a nutshell – it is awesome. Each order is now identified by different colour codes, which makes it much easier for executives or planners to differentiate tasks, assess work in progress and act immediately if there are any issues. We can also plan activities super effectively, such as communicating the date to send a pattern file, since everyone involved in that job receives an alert when the file needs to be sent. This makes the whole production process run seamlessly and smoothly. And as an old industry saying goes, ‘if you have a good capacity plan, then half of the victory has already been achieved’. Greater resilience and agility will undoubtedly enable us to navigate through and respond quickly to supply chain shocks, and future proofing for agile manufacturing will undoubtedly be the key to our success in 2023 and beyond.”
Pakawan Veerarote, Customer Success Manager, Coats Digital, said: “We are absolutely thrilled that VT Garment has experienced such unprecedented results since its adoption of FastReactPlan. The solution has positively impacted all areas of the business and proves just how vital, accurate and highly visual capacity plans are to the future growth of a fashion apparel manufacturer. We are also extremely proud that Coats Digital has played such a pivotal role in helping VT Garment secure its much-deserved recognition as one of the most innovative manufacturing companies in Thailand. With its strong commitment to sustainable practices, fair wages, great working conditions and technological innovation, we are honoured to be continuing to play an important part on VT Garment’s journey towards increased award-winning digitisation and further global success.”
Key Benefits and ROI for VT Garment Co. Ltd.
- Overall productivity improvement of 95%
- Plan accuracy increased by 92%
- OTDP improvement of 50%
- Overall planning time optimised by 57%
- Reduction in time spent loading orders by 67%
- Overall planning time reduced from 3 days to just 2 hours
- Quicker response in accepting or changing customer orders
- Ability to confidently take on new business
- Elimination of costly overtime hours
- Significant reduction in errors
- Reduction in last-minute firefighting
- Plan-based capacity monitoring in minutes
- Standardised PO, Colour & delivery level visibility across all departments
- Increased productivity across all departments
- Improved staff morale
- Automated data capture and consolidation.
About VT Garment Co. Ltd
Sportswear and outerwear designer and manufacturer VT Garment takes pride in something bigger than its award-winning quality and craftsmanship. It is one of the largest OEM/ODM factories worldwide with the Fair Trade certification – advocating better wages and working conditions, local sustainability, environmental protection and overall fair trade.
A leader in Thailand’s innovative textile manufacturing processes since it began in 1981, it has successfully implemented company-wide enterprise resource planning (ERP) and Product Life Cycle Management (PLM) solutions, and adopted Industry 4.0-driven digitalization, and manufacturing execution system (MES) – allowing machine connectivity and real-time productivity monitoring. Such conscientiousness was recognised by Thailand Lean Award 2017, which conferred VT Garment the prestigious Golden Award as a testament to its commitment to innovation and efficiency through lean management – besting not only competitors in the garment segment, but other industry leaders as well.
VT Garment is trusted by renowned names including Patagonia, Jack Wolfskin, Montbell, O’Neill and other big and small brands in the United States and Europe. Around 20% of VT Garment’s electricity usage come from solar energy. VT’s ISO 9001 and EN ISO 13485 certified facilities in Thailand and Myanmar produce functional and non-functional garments such as ski jackets and pants, boardshorts, polyester padded jackets, woven jackets and pants, knitted jackets and medical-grade isolation gowns with inhouse decoration including screen print, pad point, seam seal, laser cutting, welding, ultrasonic cutting, embossing and embroidery.
About Coats Digital
Coats Digital is the leading digital transformation partner for the fashion supply chain, powering sustainable processes and high value insights through connected technologies. We leverage deep industry and technology expertise to help brands and manufacturers optimise, connect and accelerate business critical processes from design and development to method-time-cost optimisation, production planning and control, fabric optimisation and shop floor execution.
Used in over 3,000 factories globally, our unmatched end-to-end apparel, footwear and textile software and SaaS solutions improve agility, speed to market, efficiency, transparency and sustainability. Coats Digital – transform with intelligence. coatsdigital.com
Coats Digital is the software business of Coats Group, the world’s leading industrial thread company and a trusted industry player.
About FastReactPlan
FastReactPlan is developed exclusively for the fashion, textile and apparel industry and can be configured in multiple ways to reflect industry best practice and specific business requirements.
FastReactPlan is the market-leading apparel production planning software solution, supporting a faster, more reliable order confirmation process and production plan which is optimised for delivery, speed and efficiency.
The highly visual, flexible ‘drag and drop’ approach to planning allows effective master planning across multiple factories, as well as fast, detailed and accurate scheduling of manufacturing lines/machines. Critical pre-production activities and material requirements are dynamically driven by the latest plan on a LEAN ‘just in time’ basis, supporting the reduction of inventory and lead times.
Very useful to me, I’m a swimwear manufacturer in China.